NOTES

Photo Gallery

VIDEOS

You are now here Home > Academics > Professors >

MAN: Chen Guangyu

published: 2018-01-11 11:22:41       hits: 

name : Chen Guangyu Sex: Male phone: 13308050590
email: chenguangyu@uestc.edu.cn office-address: C336  Building of School of Economics and Management
PH.D  Supervisor: Yes Master Supervisor: Yes
major: Project management;Quality management and reliability engineering
research interst: Project management; Quality management and reliability engineering
Biography: He works as Professor and Ph.D. Supervisor in School of Management and Economics in University of Electronic Science and Technology of China. He received the B.S. degree in Computer Science from Sichuan University, Chengdu, P.R.China, in 1991. Then He worked as a software engineer in Sichuan Forever Investment Group in China Academy of Engineering and Physics until 2002. At the same time, I was awarded the M.S. degree in Management Science from Southwest Jiaotong University, Chengdu, P.R.China, in 2002. He got his Ph.D. degree in Management Science from University of Electronic Science and Technology of China, in 2005. His major interests lie in system reliability modelling and optimization, engineering management. He published one teaching textbook and over 50 Journal or conference papers which include 15 papers retrieved by SCIE or EI. He was awarded the second prize of Science and Technology Progress Award in Sichuan Province in 2016. Now he serves as a member of National Technical Committee for Reliability and Maintainability Standardization of Electrical and Electronic Products and an IPMP Assessor. 
Education experience: Ph.D. in 09, Dec. 2005  University of Electronic Sci. and Tech. of China
M.A.  In 09, Jan. 2002   Southwest Jiaotong University, China
B.A.  in 03, July 1991    Sichuan University, China
Selected Publications:
1. CHEN Guangyu, Zhang Wen, Zhang Xiaomin. Modeling and decision-making of lifecycle costs under Weibull distribution. Systems Engineering-Theory&Practice, 2016, 36(11): 2933-2940 (in Chinese)
2. CHEN Guangyu, Zheng Shuyang, Feng Yi. Optimazation modeling of system lifecycle costs under reliability constraints. Journal of Systems Engineering, 2015, 30(4):442-450 (in Chinese)
3. CHEN Guangyu, WANG Weixian, SHAO Yunfei, et al. Dynamic modeling method for efficiency of large scientific engineering project. Technology Economics, 2015, 34(12):93-100 (in Chinese)
4. CHEN Guangyu, Li Jing, Zhang Xiaomin, et al. Laser & Optoelectronics Progress, 2015, 52(8):081407 (in Chinese)
5. CHEN Guang-yu, Li Jing, Liu Nan, et al. Mission availability modeling methods for k/N(G) fleet under time constraints. Journal of University of Electronic Science & Technology of China. 2014, 43(6): 943-949 (in Chinese)
6. CHEN Guangyu, Zhang Xiaomin, TANG Xiaowo. Separable binary decision diagram based analysis of generalized phased-mission systems reliability. Systems Engineering-Theory&Practice, 2013, 33(5):1240-1246  EI 20132616448760  (in Chinese)
7. CHEN Guang-yu, ZHANG Xiao-min, ZHENG Wan-guo, et al. Evaluation methods and models of mission availability for ICF laser facility. High Power Laser and Particle Beams, 2012,24(9):2103-2108  (EI 20124215582620)  (in Chinese)
8. CHEN Guang-yu, ZHANG Xiao-min, et al. Synthetic methods for beam to beam power balancing capability of large laser facilities. High Power Laser and Particle Beams, 2011,23(6): 1564-1568 (in Chinese)
9. Chen Guangyu, Zhang Xiaomin. Diagnostic Systems for Power Balancing Large Laser Fusion Facilities[C]. Proceedings Annual Reliability and Maintainability, 2009, 1.  (EI 20093912333287)
10. CHEN Guang-yu, ZHANG Xiao-min, et al. Reliability analysis of minimum energy on target for laser facilities with more beam lines. High Power Laser and Particle Beams, 2008,20(12): 2032-2036    (EI 20090711910071) (in Chinese)
11. CHEN Guang-yu, HUNAG Xizi,TANG Xiaowo.Synthetic methods for Reliability Analysis of Phased-Mission System with Imperfect Coverage. Journal of Systems Engineering, 2007, 22(5): 539-545 (in Chinese)
12. CHEN Guang-yu, Yang Dong, ZHANG Xiao-min, et al. Reliability analysis of Xe-flashlamps of disk amplifier subsystems for laser facilities. High Power Laser and Particle Beams, 2007,19(7):1125-1128 (EI 20073710810408) (in Chinese)
13. CHEN Guang-yu, HUNAG Xizi,TANG Xiaowo. Integrated Analysis of Phased-Mission System Reliability with Imperfect Coverage. Systems Engineering-Theory&Practice, 2006, 26(4): 1-8.   (EI  06229913404) (in Chinese)
14. Guangyu Chen, Xizi Huang, Xiaowo Tang. A BDD&SEA Based Analysis of Phased-Mission System Reliability[C]. Proceedings Annual Reliability and Maintainability, 2006: 456-463. (EI 20072510656106)
15. CHEN Guang-yu, HUNAG Xizi,TANG Xiaowo. Reliability Analysis of Hierarchical Systems with Imperfect Coverage. Journal of Systems Engineering, 2005, 20(5): 504-510  (in Chinese)
16. CHEN Guang-yu, HUNAG Xizi,TANG Xiaowo. Hybird Methods for Reliability Analysis of Phased-Mission Systems. Systems Engineering-Theory&Practice, 2005, 25(2): 86-93)    (EI  05149026345)  (in Chinese)
17. Guangyu Chen, Xizi Huang, Xiaowo Tang. Reliability Analysis of Hierarchical Systems[C]. Proceedings Annual Reliability and Maintainability, 2005: 146-151  (SCI  BCA63 ),  (EI 05479494754,06219892323)
18. CHEN Guang-yu, HUNAG Xizi,TANG Xiaowo. Modular Solutions for Fault Tree Analysis of Reliability of Systems. Journal of University of Electronic Science & Technology of China. 2006, 35(6): 989-992.  (EI  070510401070) (in Chinese)
Books: Project Management Information System, 2011, Press of UESTC